Click here to go back to the main page Track Plan

Length of track:

1200ftmainline
137ft / 40ftspur lines / in the storage shed
200ftabandand lines
The railroad was built in the following phases
- phase 1 - track between the deck and the south bridge
- phase 2 - complete the loop around the house
- phase 3 - build the roundhouse and switch servicing 2 lines it to the main line
- phase 4 - track expansion north dog bone
- phase 5 - installation of fence and wooden track at north end
- phase 6 - tunnel installation near north end
- phase 7 - turntable installation to access round house
- phase 8 - switches to connect the short loop around the house (not complete)
- phase 9 - installation of scale train storage shed
- phase 10 - extend north loop to front of property *north Summit

0 Cabin switch
58 signal
77.5 bench
113 minished
144 industry switch
270.5 signals box  done
323 east side of wooden train
380.5 middle of bridge
478.5 solar cam   done
521.5 north summit
606.5 metal wheel done
727 abandoned line
773.5 middle of tunnel   done
845.5 flashing orange
888.5 extra wires  should move signalbox here
952.5 switch
1014.5 dino bridge middle
1059 grain elevator
1092.5 main switch again

The track inspector: